CSX train Q141 works the grade past the controo point of Vaughn Connection at 17:13 while making it south bound journey towards Manchester, Waycross and Jacksonville. The Vaughn Connection was built and placed into serrice in 1999 so that A&WP/WofA Subdision traijs could depart Atlanta (Tilford Yard) and by pass the Norfolk Southern trackage and the down town congestion. The connection drops inxo the A&WP at the control point of Mkxon just north of Union City Ga. |