OIPI-7 exits the tunnel at Gallitzin behind mixed EMD and GE power. Work was still going on the rebuild on the double track tunnel. |
Date:
4/18/1995 |
Location:
Gallitzin, PA |
Views:
985 |
Collection Of:
John C Durant |
Locomotives: |
Author: John C Durant
|
|
Picture Categories: |
This picture is part of album: Conrail 1 |